Basic brickwork replacement
Contents |
[edit] Introduction
Replacing faulty or decayed brickwork can be a difficult process, but simple projects may only require these steps.
[edit] Preparations
Cut away the damaged brick, clean out the hole completely and make sure no dust remains. Gently douse the newly created void with water, making sure to include the top and sides of the recess. Include the surrounding brickwork as well.
Fit the replacement brick into the space that has been created. It should fit easily into the hole, with sufficient space for mortar to surround it. Remove the brick and trim away some of the bottom bed edge so it looks like a slightly truncated wedge.
Cover the underside of the top brick with mortar for the top bed-joint. Some will naturally fall onto the bottom surface of the recess. This should be spread across the sides and bottom to form the cross joints and bed joint.
[edit] Positioning and placing
Take the replacement brick, cover all of it (except the face) with a coat of mortar, place it into the hole and then drive it in gently but firmly with the end of a brick hammer. Additional pressure may be applied by using a small piece of wood and a lump hammer. It is important to keep the brick level during this process; otherwise, it will be difficult to straighten it and the surface will not be flush.
When the brick is pushed into place, extra mortar will be forced out. This should be removed with a trowel.
Once the brick is driven into the proper position, some of the mortar should be left projecting from the joint. Once the extra mortar begins to stiffen, it can be pushed back into the joint with the edge of the trowel. This should solidify the joint and help to make the repaired brick a more integral part of the wall.
[edit] Related articles on Designing Buildings
Featured articles and news
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.